Stone retaining wall repair in Colorado: If the block Retaining wall is more substantial as in a metre high or more then the fence would have to be behind the wall instead of through or on top. Most Segmental Retaining Wall blocks do not have a big enough cavity or void for the fence post to be directly concreted inside them and would lack the strength to hold the weight of a fence. Generally, most walls are built using an aggregate (Gravel) backfill or in some circumstances No Fines Concrete (NFC). Because of this, an allowance has to be made for the fence post at the early construction stage such as installing PVC Piping as a sleave for the fence post to fit into, this would require some forethought and good planning.
Anyone with a strong back can stack up a bunch of blocks and build a pretty stone retaining wall. But it takes skill and planning to construct an attractive wall that can also handle immense pressure, shrug off the forces of gravity, stand for decades and laugh in the face of Mother Nature. That’s the kind of wall we wanted to learn how to build, so we went to work with some hardworking hardscaping pros. They showed us that it’s all about a solid base, proper drainage and the right materials for the job. They also shared a few handy tips they’ve picked up over the years.
A wall that leans into the soil it retains is less likely to be pushed outward by soil pressure than a plain-old vertical wall. Design and build your retaining wall to slope at a minimum rate of one inch for every one-foot of rise (height). Fortunately, working with retaining wall blocks makes it incredibly easy to achieve this “step-back” construction! The locking flange on the bottom edge of every block guides it to click into position slightly behind the lower block, preventing the top blocks from being pushed outward.
Good drainage is essential for any retaining wall. Drainage is provided by filling coarse gravel behind the wall and by building weep holes into the wall. Make weep holes by inserting short lengths of 2-inch plastic pipe or 3-inch drain tile in the forms when they are built. The first row should be 2 inches to 4 inches above ground level. If the wall is higher than 4 feet, place a second row of weep holes 3 inches above the first. Find even more information at Colorado Retaining Wall Builder.
We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery.